Sign In | Join Free | My xuijs.com
China Wuhan Huaying Electric Power Tech & Science Co.,ltd logo
Wuhan Huaying Electric Power Tech & Science Co.,ltd
Active Member

8 Years

Home > CT PT Analyzer >

Current Transformer Testing Equipment

Wuhan Huaying Electric Power Tech & Science Co.,ltd

Current Transformer Testing Equipment

Price : email whhy818@163.com

Place of Origin : Wuhan,Hubei,China

Brand Name : Huaying

Certification : ISO CE

MOQ : 1 set

Packaging Details : wooden case

Delivery Time : 7 working days

Payment Terms : T/T L/C

Supply Ability : 200 sets per month

Contact Now

CT PT Analyzer HYVA-404

Tests for Current Transformer:
1 Excitation curve and parameters test
2 Turns ratio test
3 Ratio and phase error test
4 Polarity mark check
5 Winding resistance measurement
6 Secondary loop burden measurement
7 Error line curve test for protection CT
8 Transient CT parameters test
9 CT nameplate guess
10 Saturation hysteresis loop curve measurement
Tests for Voltage Transformer:
1 Turns ratio test
2 Ratio error and phase angle error test
3 Polarity test
4 Secondary burden test
5 Winding resistance test
Applications of CT/ PT Analyzer:
1 CT nameplate check
2 CT parameters check in work burden
3 CT transient parameters analysis
4 CT ratio and phase error calibration
5 PT routine test

1 Test standards: IEC60044-1, IEC60044-6, IEC60044-2, IEC60044-5, C57.13
2 Power supply: AC220V±10%, 50/60Hz±10%
3 Voltage output: 0.1~180V (AC)
4 Current output: 0.001~5A(RMS)
5 Power output: 500VA
6 Maximum knee voltage measurement: 45KV
7 Current measurement:
Range: 0~10A (automatically change range in 0.1/0.4/2/10A)
Error: <±0.1%+0.01%FS
8 Voltage measurement:
Range: 0~200V (automatically change range in 1V/10V/70V/200V)
Error: < ±0.1%+0.01%FS
9 Turns ratio measurement:
Range:1~35000
1~2000 error<0.05%
2000~5000 error<0.1%
5000~35000 error<0.2%
10 Phase measurement: error: ±2min; resolution: 0.01min
11 Winding resistance measurement:
Range: 0~8kΩ (automatically change range in 2ohm/20ohm/80ohm/800ohm/8kohm)
Error: < 0.2%RDG+0.02%FS
Maximum resolution: 0.1mΩ
12 Temperature measurement:-50~100 Celsius degree; error<3 Celsius degree
13 CT Secondary burden:
Range: 0~160ohm (automatically change range in 2ohm/20ohm/80ohm/160ohm)
Error: <0.2%RDG+0.02%FS
Maximum resolution: 0.001ohm
14 PT Secondary burden:
Range: 0~80kohm (automatically change range in 800ohm/8kohm/80kohm)
Error :<0.2%RDG+0.02%FS
Maximum resolution: 0.1ohm
15 PT ratio measurement:
Range: 1~35000
1~10000 error<0.1%
10000~35000 error<0.2%
16 PT ratio error measurement: Typical error <0.05%, Maximum Error<0.1%
17 PT phase angle measurement: maximum error < 3min
18 Make evaluation for test results according to selected standards
19 Make word report for test result
20 Make word reports one time for multi-group test records on the PC
21 Calculate the ratio errors and phase angle errors at rated burden and working burden in one time test
22 Compare excitation curves with saved excitation curves in the same window
23 Memory capacity: >1000 groups test results
24 Working condition: temperature: -10℃~50℃; moist: ≤90%


Best Current Transformer Testing Equipment wholesale

Current Transformer Testing Equipment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Wuhan Huaying Electric Power Tech & Science Co.,ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0